RoadworksMalaysia

An introduction to the traffic rules and road signs of Malaysia. Learn about driving, road safety and much more in our illustrated book, with answers to frequently asked questions.

For informational purposes only. Always follow official regulations. Some content and images were created with AI assistance.


1. Roadworks

Roadworks are construction, maintenance, repair or inspection activities carried out on or beside a road. They may temporarily change the road layout, lane widths, speed limits, priority, permitted directions and facilities for pedestrians or cyclists.

Drivers must follow the temporary signs, traffic lights, barriers, road markings and instructions from authorised personnel. They should reduce speed, increase their following distance and remain prepared for narrow lanes, stopped traffic, workers, machinery and sudden changes in the route.

What should you watch for when approaching roadworks in Malaysia?

Look for temporary warnings, cones, barriers, narrow lanes and construction vehicles. Road layouts can change temporarily, including lane shifts, traffic-light control and short one-way sections. Expect workers and slow or stationary traffic near the worksite.

🔗 lom.agc.gov.my • Malaysia Road Transport Act 1987 — Sections 40, 43, 48, 69–70 and 77–79: speed, care, obstruction and actual traffic controls

🔗 lom.agc.gov.my • AGC — enacted Road Transport (Amendment) Act 2026, Act A1794, operative amendments

🔗 mot.gov.my • MOT — commencement on 16 October 2026; deferred compound ceiling distinguished

Is a temporary speed limit at roadworks binding in Malaysia?

Where an authorised temporary regulatory speed limit is in force, you must obey it. A roadworks warning alone should not be mistaken for a new numerical limit, but conditions may require driving more slowly.

🔗 lom.agc.gov.my • Malaysia Road Transport Act 1987 — Sections 40, 43, 48, 69–70 and 77–79: speed, care, obstruction and actual traffic controls

🔗 lom.agc.gov.my • AGC — enacted Road Transport (Amendment) Act 2026, Act A1794, operative amendments

🔗 mot.gov.my • MOT — commencement on 16 October 2026; deferred compound ceiling distinguished

What if only one lane remains open through roadworks in Malaysia?

Follow the temporary signals, stop/go instructions, lane arrows and priority signs. Do not enter an opposing traffic lane until permitted, and give vulnerable road users and road workers extra room.

🔗 lom.agc.gov.my • Malaysia Road Transport Act 1987 — Sections 40, 43, 48, 69–70 and 77–79: speed, care, obstruction and actual traffic controls

🔗 lom.agc.gov.my • AGC — enacted Road Transport (Amendment) Act 2026, Act A1794, operative amendments

🔗 mot.gov.my • MOT — commencement on 16 October 2026; deferred compound ceiling distinguished

Warning for roadworks. Warning for roadworks.

English • Traffic sign JPJ KPP2021 • 1.5(1) • Road repairs. Slow down and obey temporary traffic controls.

Bahasa Melayu • JPJ KPP2021 •1.5(1) • Jalan sedang dibaiki. Kerja pembaikan jalan sedang dijalankan. Perlahankan kenderaan dan patuhi arahan kawalan lalu lintas sementara.