Priority roadBrussels

Learn traffic rules with clear explanations and visual examples in our illustrated book, designed to make studying simple and engaging.


21. Priority road

A priority road is a road whose traffic is given priority over traffic entering from intersecting roads. It is normally identified by a priority-road sign, while an end sign indicates where that continuing priority status stops.

Drivers on a priority road must still obey traffic lights, authorised officers, speed limits, crossings and turning rules. Having priority never allows a driver to proceed when doing so would create danger or block an intersection.

Priority-road sign in Seraing. (Liège, Belgium)
Wikimedia.org • Jeanhousen • CC BY-SA
Which Belgian traffic signs indicate the beginning and end of a priority road?

Traffic sign B9 indicates the beginning of a priority road. Traffic sign B11 indicates the end of a priority road.

Start of a priority road. Start of a priority road.

Signal routier B9 • Voie prioritaire.

Verkeersbord B9 • Voorrangsweg.

End of the priority road. End of the priority road.

Signal routier B11 • Fin de voie prioritaire.

Verkeersbord B11 • Einde van voorrangsweg.

What changes for priority roads under Belgium’s new Road Code?

Belgium’s new Code of the Public Road takes effect on 1 June 2027. The priority-road signs keep their existing numbers: traffic sign B9 continues to indicate a priority road, while traffic sign B11 continues to indicate the end of a priority road. Their basic meaning therefore remains unchanged under the new Road Code.

Start of a priority road. Start of a priority road.

Signal routier B9 • Voie prioritaire.

Verkeersbord B9 • Voorrangsweg.

End of the priority road. End of the priority road.

Signal routier B11 • Fin de voie prioritaire.

Verkeersbord B11 • Einde van voorrangsweg.

What does Belgian traffic sign B9 mean?

B9 means that drivers following the priority road have priority at intersections over drivers entering from controlled side roads.

Where does a Belgian priority road begin?

The priority road begins at traffic sign B9. Belgian placement rules require the sign to be installed at the beginning of the priority road.

Must B9 be repeated after an intersection?

Yes. Under the current Belgian placement rules, B9 must be repeated after every intersection while the road continues as a priority road.

Does a Belgian priority road end at every intersection?

No. Its priority status continues until sign B11 indicates the end. The repetition of B9 after intersections confirms that continuing status.

Which signs are normally placed on the side roads?

Drivers entering the priority road are normally controlled by traffic sign B1, meaning give way, or B5, meaning stop and give way.

Must traffic from both sides give way?

Yes. Drivers entering from controlled side roads must give way whether they approach from the left or the right.

Does priority from the right apply to drivers entering a B9 road?

No. A driver facing B1 or B5 must give way to traffic on the priority road, including traffic approaching from the left.

Does a Belgian priority road always continue straight ahead?

No. The priority road may bend or follow another branch at an intersection. A supplementary diagram may show the route followed by the priority road.

Must you use an indicator when the priority road bends?

Use the indicators whenever following the priority route causes an actual change of direction or lateral movement. Having priority does not remove the obligation to signal.

What is the difference between B9 and B15?

B9 indicates a continuing priority road and is repeated after intersections. B15 indicates priority only at the next intersection.

What is the difference between B9 and B17?

B9 indicates a priority road. B17 warns of an intersection where priority from the right applies.

Can B9 be placed on a Belgian roundabout?

No. Belgian placement rules prohibit B9 on a roundabout indicated by D5. Priority at the roundabout is established through the signs controlling its entrances.

Does B9 give priority at traffic lights?

When the traffic lights are functioning, the priority signs placed on the same road do not apply at that location. Drivers must follow the traffic lights.

What happens when the traffic lights flash orange-yellow?

The flashing orange-yellow light requires extra caution but does not suspend the priority arrangement. The B9 priority signs therefore remain relevant.

What if an authorised officer directs traffic?

Follow the officer’s instructions. Orders from an authorised person take precedence over traffic lights, traffic signs and ordinary traffic rules.

Does B9 give you priority over pedestrians?

No. B9 primarily regulates priority between drivers at intersections. Drivers must still give way to pedestrians at crossings and when turning where Belgian rules require it.

Must you give way to cyclists when turning?

Yes, where the cyclist continues lawfully along another part of the same public road or uses a bike path you cross. The priority-road sign does not remove these turning and crossing obligations.

Does B9 impose a speed limit?

No. The applicable regional, built-up-area, zonal, posted and vehicle-specific speed limits remain in force.

May you overtake on a Belgian priority road?

B9 does not itself authorise or prohibit overtaking. Drivers must respect the ordinary overtaking rules, road markings, visibility and any local prohibition signs.

May you park on a Belgian priority road outside a built-up area?

No, not on the carriageway. Parking on the carriageway of a B9 priority road outside a built-up area is prohibited.

May you briefly stop outside a built-up area?

The B9-specific rule prohibits parking on the carriageway, not every brief stop. General stopping prohibitions still apply wherever stopping would be dangerous, obstructive or otherwise prohibited.

May you park on a priority road inside a built-up area?

B9 alone does not create a general parking prohibition inside a built-up area. Drivers must follow the ordinary parking rules, signs and road markings.

Does a vehicle leaving a driveway have priority because it enters a B9 road?

No. A driver entering from a driveway, property or parking place is performing a manoeuvre and must give way to other road users.

May you block an intersection when driving on the priority road?

No. Priority does not allow you to enter an intersection when congestion would probably force you to stop and obstruct it.

Which Belgian sign ends a priority road?

Traffic sign B11 indicates the end of the priority road.

What does Belgian traffic sign B13 mean?

Traffic sign B13 announces that B11 is ahead and displays the approximate distance to the end of the priority road.

What priority rule applies after B11?

At the intersection where the priority road loses its status, the applicable rule must be indicated by B1, B5 or B17. Drivers must follow that sign rather than assume they still have priority.

1 Brussels 2 Motorway 3 Expressway 4 Residential area 5 Built-up area 6 Zone 7 Speed limit 8 Bike path 9 Cycling street 10 Pedestrian zone 11 Speed bump 12 Customs 13 One-way traffic 14 Quay 15 Slope 16 Bus lane 17 Dead end 18 Stop sign 19 Give way 20 Roundabout 21 Priority road 22 Road narrowing 23 Priority over oncoming traffic 24 Give way to oncoming traffic 25 Pedestrian crossing 26 Railway crossing 27 Mandatory direction 28 Turn prohibition 29 School area 30 Crossing animals 31 Rockfall 32 Curve 33 Chevron 34 Wrong-way driving 35 Roadworks 36 Height limit 37 Width limit 38 Weight limit 39 Radar speed sign 40 Selective barriers 41 Intersection direction sign 42 Priority at the next junction 43 Traffic lights 44 Pedestrian lights 45 Driving licence 46 Location marker 47 Traffic mirror 48 International border 49 Cycling route 50 Parking 51 No parking 52 Kiss and ride 53 Parking meter 54 Traffic management 55 Reversing 56 Uncontrolled crossroad 57 Road surface 58 Ring road 59 Cycle highway 60 Licence plate 61 Charging station 62 Dangers 63 Turn on red 64 Identity card 65 Fire risk 66 Pedestrian 67 Moped 68 Car 69 Truck 70 Bus 71 Police 72 Ambulance 73 Tram lights 74 European emission standard 75 Pothole 76 Public square 77 Path 78 Particulates 79 Air pollution 80 Rush hour 81 Road code 82 Street gutter 83 Cargo bike 84 Forestry vehicle 85 Construction vehicle 86 Semi-trailer truck 87 Trolleybus 88 Speed pedelec 89 Delivery vehicle 90 Idling 91 Tow truck 92 Four-wheel drive 93 No vehicles 94 Bicycle 95 Motorcycle equipment 96 Railcar 97 Rail track 98 Public transport 99 Caravan 100 Trailer ...